| I spent most of my spare time this past winter (2012-13) framing a "room within a room" |
| The control room became a disaster. |
![]() |
| James Salls - my "go to professional" for this entire project came in and helped me frame the ceiling in 2 days. |
![]() |
| New Years Eve 2012 - at 11:45PM we did some gang vocals for Graveyard Lovers. |
![]() |
| Daryl and I spent 2 days listening to metal and insulating the new room. |
| I brought in a professional dry wall team to hang 5/8" drywall. February 2013 |
| We had a weekend painting party. |
![]() |
| In order to re-finish the floors, I had to mount the drum riser on wheels. Climbing under there was terrifying. |
| Cleaning the floors. |
| Sand the floors. |
| Wax on wax off. |
| Re-installed lighting and mounted locally built Enerjoy Radiant Heating. Super Efficient, super cool looking. |
| Moving stuff in and around to make space and keep working. |
| Daryl helped me install and stain all the trim. |
![]() |
| Iso booth build. |
| With 3 or so pieces left to nail in, I shot myself with the nail gun and had to take a week off. |
![]() |
| drywalling the iso. |
| install and stain the final pieces of trim. |
| Installed card catalog / mic drawers. |
| Got some new toys (Adam a8x and Mackie HR824s) |